In the case of a building composed of multiple levels, if the plans were not perfectly aligned before detection, it is recommended to manually align the entire level with the lower level. Thus, by selecting all the elements, as well as the underlying plan, use the move function by choosing a singular point present in both levels to align all the elements.
This manipulation implies that the scales of the plans are compatible to ensure consistent dimensions.